Rehabilitation of a DN 900 GG (PN 10) pressurized sewer pipeline
Highlights: 1,600 m of in-line liner installation in 8 sections, each 200 m long starline®STRUCTURE* system as a self-supporting pressure…
Unser letzter Artikel
Highlights: 1,600 m of in-line liner installation in 8 sections, each 200 m long starline®STRUCTURE* system as a self-supporting pressure…
For the renovation of the wastewater system, a trough-shaped excavation with sheet piling, a concrete sub-base, and an HDI seal…
The project calls for two trench excavation sites and one pipe-jacking operation, each with a DN 1000 pipe. Large clusters…
Vattenfall needed to increase the pressure in its district heating pipelines in order to further expand service in the urban…
As part of the sewer system renovation project, KARL WEISS Technologies excavated the foundation pit and installed the connections for…
As part of the renovation of the historic Bötzow Brewery in Berlin, extensive measures were taken to secure the construction…
The backfilling of the BEHALA Tunnel represents an impressive milestone in civil engineering. By using 3,600 m³ of liquid soil, we…
The summer toboggan run at the 2017 IGA was planned not only as a highlight of the event, but also…