Highlights:

  • Two parallel pipelines laid on a slope, with gradients reaching 100% in some sections and featuring various pipe bends
  • between the pumping station on the Limmat and the plant premises
  • 300 m of pipeline rehabilitation using the starline®HPL-S method in 4 sections