Rehabilitation of a DN 900 GG (PN 10) wastewater pressure pipeline
Highlights: 1,600 m inliner installation in 8 sections of 200 m each starline®STRUCTURE* system as self-supporting pressure hose liner Max.…
Unser letzter Artikel
Highlights: 1,600 m inliner installation in 8 sections of 200 m each starline®STRUCTURE* system as self-supporting pressure hose liner Max.…
A trough excavation with sheet pile wall, underwater concrete base and HDI seal is planned for the renewal of the…
Two trough excavation pits and a pipe jacking of DN 1000 each are planned for the project. Large boulder pockets…
The company Vattenfall needed to increase the pressure of its district heating pipes in order to further expand the supply…
As part of the renovation of the sewer network, KARL WEISS Technologies constructed the excavation pit and the connections for…
As part of the conversion of the historic Bötzow brewery in Berlin, extensive measures were carried out to secure the…
The backfilling of the BEHALA tunnel represents an impressive milestone in the art of civil engineering. With the use of…
The summer toboggan run at the IGA 2017 was not only planned as the highlight of the event, but also…